My guard does not look that professional. It appears to an eyebrow fabricated from a piece of 1" wide flat that has been curved up and over the top of the pulley and welded to two bolts that fit into the vacant bolt holes at either end of the top of the compressor. I'd imagine it would take less than 30 minutes to fabricate.
				
			 
			
		 
			
				
			
			
				'95 110 300TDI, F&R ARB Lockers, Twine Shower, Aux Sill Tank, Snorkel, Cargo barrier, 9 seats, swingaway wheel carrier, MadMan EMS2 
'85 110 Isuzu NA 4BE1 3.6l Diesel, 0.996 LT-95, Rear Maxi (SOLD)
'76 SIII 109" Nissan ED33 5-SP Nissan GBox (SOLD)
			
			
		 
	
Bookmarks