There is, as suggested, a laid down test procedure, which is along the lines of "park for 24hrs unloaded, measure spring stop clearance. Load half a dozen bags of cement in the back, drive half a kilometre over a not too smooth road, measure clearance on spring stops. Should be the same withing x mm".
But basically, I found that with a full load, it was sitting on the stops and stayed there.
John

