Linglong One SMR hits and misses
	
	
		The small side can work or NOT[bigrolf]. 
The plan was "Construction time is expected to be 58 months. For the demonstration plant, the reactor vessel is being supplied by Shanghai Boiler Works Limited, the steam generators by a CNNC subsidiary and other reactor internals by Dongfang Electric Corporation."  "CNNC announced in July 2019 the launch of a project to construct an ACP100 reactor at Changjiang. The site is already home to two operating CNP600 PWRs, while the construction of the first of two Hualong One units began in March last year. Both those units are due to enter commercial operation by the end of 2026."
https://subsites.chinadaily.com.cn/c...4896004609.jpg
https://en.cnnc.com.cn/2023-08/10/c_909696.htm  
The five-year build time on a FIRST of kind is ambitious. 
The recent fail of Nuscale SMR planned first was due to including escalating costs and insufficient contracts for electricity sales- This company is a very good reason why never take investment advise from ME :) A small BURN in my pocket money.
I personally see the Nuscale missfire mostly due to changing the goal post! Its 2015 plan was changed multiple times in very costly ways!
	 
	
	
	
		USA bill to stop Nuclear Fuel from Russia
	
	
		Some dayz life is just too easy!
"A number of Senate majority leaders are signaling that they will not pass this bill “unless it includes $2.7B to cover expenses necessary for at least two competitive awards for the acquisition and distribution of U.S. LEU and HALEU,” according to UxC."
[COLOR=rgba(0, 0, 0, 0.6)]“
Nobody Told Me There’d Be Days Like These.[COLOR=rgba(0, 0, 0, 0.6)]”[/COLOR]
[/COLOR]
— John Lennon  [thumbsupbig][thumbsupbig][thumbsupbig]
	 
	
	
	
		Red wine in hand- Cheers all- Non alcoholic types fine with me !!!!!
	
	
		Some dayz life gets easier. Less is more for some of us [biggrin]
Next key is 8 Feb. I ran a long way waiting for 8am Uk time. They put it up early :)
London Stock Exchange | London Stock Exchange