bob10
22nd December 2015, 08:15 AM
Australia?Land Rover Discovery 4
Jaguar Land Rover Australia?Land Rover Discovery 4
PRA number: 2015/15111
Date published: 21st December 2015
Product information
Product description
Land Rover Discovery 4 2012 and 2013
Identifying features
Campaign number: P065
VIN Range: SALLAAAF4CA642486 to SALLAAAG5CA647258
What are the defects?
On certain vehicles the primer used to bond the panoramic roof glass to the panoramic roof assembly may not have been to the correct specification.
What are the hazards?
If the panoramic roof glass panel detaches from the vehicle, it may collide with other vehicles on the road or compel other road users to take evasive action. This could increase the risk of a vehicle crash.
Where the product was sold
Nationally
Supplier
Jaguar Land Rover Australia
What should consumers do?
Jaguar Australia will be writing directly to customers with vehicles affected by this recall requesting them to contact their preferred Authorised Repairer as soon as possible to arrange for the rework action to be carried out at the earliest opportunity.
Jaguar Land Rover Australia?Land Rover Discovery 4
PRA number: 2015/15111
Date published: 21st December 2015
Product information
Product description
Land Rover Discovery 4 2012 and 2013
Identifying features
Campaign number: P065
VIN Range: SALLAAAF4CA642486 to SALLAAAG5CA647258
What are the defects?
On certain vehicles the primer used to bond the panoramic roof glass to the panoramic roof assembly may not have been to the correct specification.
What are the hazards?
If the panoramic roof glass panel detaches from the vehicle, it may collide with other vehicles on the road or compel other road users to take evasive action. This could increase the risk of a vehicle crash.
Where the product was sold
Nationally
Supplier
Jaguar Land Rover Australia
What should consumers do?
Jaguar Australia will be writing directly to customers with vehicles affected by this recall requesting them to contact their preferred Authorised Repairer as soon as possible to arrange for the rework action to be carried out at the earliest opportunity.