Roverlord off road spares
25th May 2016, 07:38 PM
Just watched Megafactories - Rolls Royce and saw the Phantom being hand built.
Wood work veneer is hand done takes a month to complete an interior, pin stripes hand painted takes a gut 3 hours to do a stripe ( steady hand, french chalks the go stops his hand sticking as he moves the brush along) 17 days to do the leather interior, and they check each leather hide for blemishes like mosquito bites etc
I want one as a daily drive, the only thing that is putting me off signing up for one is I don't really like the front end.;)
oh well just have to put up with my plastic woodgrain on my ES for a little longer.:D
Wood work veneer is hand done takes a month to complete an interior, pin stripes hand painted takes a gut 3 hours to do a stripe ( steady hand, french chalks the go stops his hand sticking as he moves the brush along) 17 days to do the leather interior, and they check each leather hide for blemishes like mosquito bites etc
I want one as a daily drive, the only thing that is putting me off signing up for one is I don't really like the front end.;)
oh well just have to put up with my plastic woodgrain on my ES for a little longer.:D