9th April 2008, 09:23 PM
Hi guys
just trying to get the plans together after the planning department asked for more info... so a few questions for you clever lot
i'm trying to find out the approximate cost per m3 of concrete as im thinking of dropping a slab down rather than leave the existing block pavers there. this is WA by the way :)
the other thing im trying to find out is how to specify the termite control on the plans i currently have
· Biflex @ 1% applied to relavent Australian standard (AS 3660) by (insert company name here
· Applied as required by standard to footings / slab
Thanks in advance .. im sure i'll have more Q's
Steve
just trying to get the plans together after the planning department asked for more info... so a few questions for you clever lot
i'm trying to find out the approximate cost per m3 of concrete as im thinking of dropping a slab down rather than leave the existing block pavers there. this is WA by the way :)
the other thing im trying to find out is how to specify the termite control on the plans i currently have
· Biflex @ 1% applied to relavent Australian standard (AS 3660) by (insert company name here
· Applied as required by standard to footings / slab
Thanks in advance .. im sure i'll have more Q's
Steve