I have done a bit of "Tinkering" over the last few days and have managed to take the Titan rear drawers out of the D2a and fit them sideways on the navara, i have wired up the spotties, fitted a couple of led reversing/work lights, fabricated a back rail on the tray and have given the truck a service.
I have yet to replace the oil in the diffs, transfer case and gearbox and fit a blanking plate in the EGR to stop the usual Navara "smoke ring" on acceleration.
I also have yet to fit the second battery and fit the 160w solar panel with 2x standalone 125AH batteries with solar regulator to power the 2x 12v fridges.
I should have everything done by the new year and intend to head up to the mouth of the Fortescue river for a few weeks fishing in Jan-Feb
My daughter has volenteered to detail my D2a for me, God bless her and I have organised the rear end repairs to be done at Whyatts and am now awaiting the approoval from my insurer for the windscreen and plenium to be done at Whyatts as well.
I will refit the 2nd row seats and fit the new lower temp thermostat and take the old girl out on the tracks as soon as everything is fixed
Bookmarks