The whole obsolete copper network was supposed to be bypassed with fibre from exchanges to premises, but then Abbott and Turnbull decided to use copper from street nodes to premises, so we didn't get fibre, which is the method for the future. It's a classic case of cost-cutting causing a stuff up.

