More done today, but what follows will be it for now, have a few other things that need my attention this week.
First cupboard back in permanently - plumbing required that I won’t have good access to also done. The water pump, accumulator and filter will all life under this cupboard with easy access by removal of the kick panel.
446FCD37-BECF-4FB3-982F-8FA8A72C787B by Gavin Gregory, on Flickr
Also modified this cupboard to fit a pull out rubbish bin.
AAD92382-CF0D-4304-8686-021C064770FA by Gavin Gregory, on Flickr
Drawer base back in and bench top back on.
11E405F3-27EB-416C-BB39-A03B4669094D by Gavin Gregory, on Flickr
BA1C04C9-D5C9-4F46-B639-B4697073ED69 by Gavin Gregory, on Flickr
8C7B7221-9D4D-4153-BCF4-7B432B2F9523 by Gavin Gregory, on Flickr
That’s about the last of the major structural work so I can bring a lot of the stuff back in now. Still have some cupboards and shelves to put in, but they won’t make the mess all this has caused.