Cmon 4 days now and no updates is a bit rough. :mad:
Printable View
Cmon 4 days now and no updates is a bit rough. :mad:
Put some pics up tonight, been burning the candle both ends, hopfully get most of the purlons up today ready for the colorbond on friday. Take a bit easy during this week I hope.
cheers
blaze
A couple more pics, been windy with showers today, what a pain when trying to build a shed
https://www.aulro.com/afvb/images/im...010/09/865.jpg
https://www.aulro.com/afvb/images/im...010/09/866.jpg
cheers
blaze
Nice, love those laminated beams. No eaves though?
been following the pics of your shed build.
I dont need to know figures just wondered if it works out cheaper building your own wood frame rather than buying one of the ready done colourbond things from a shed manufacturer.
I want a shed, (dont we all) about 9mx12m-ish just wondered if it was cheaper or because you know its a job well done?
Was taking to a builder way before I started and he said if he was to build a timber frame shed of the same size it would be about $2000 more for the timber frame. For me I think it will work out about the same and the shed is exacly like I want. When I was tgetting quotes on metal framed sheds the minute you mentioned changes from standard the price went up very quick.
cheers
blaze
I used to have a bird avery where the shed now sits, not as high and only 3metres wide but about the same lenth.
cheers
blaze
Haven't you finished the bloody thing yet....;)
Good on ya banjo:D;)
Mrs hh:angel: