The reo was placed on regular chairs, approx. 50mm high.
The surface cracking I can live with, providing it's an appearance issue that does not affect the strength of the slab or deteriorate over time.
The erection of the shed is due to start in a few days time (so they tell me) so I'm tempted to have another structural engineer look at it before building commences.

