Doesn't the law instruct him to properly secure his load?
We would tie 25 lengths of 100mm Telstra conduit on an angle from the tray of a Hilux ute to up over the head board. We would back up to a wall to load them and tie them on. They were always tied with Telstra rope and I never lost one. We did however employ/hire some guys through Skilled Engineering. They were just employed as labourers so I guess I can't be too harsh that they weren't very skilled. More than one of those guys managed to loose more than one length.
It's all about how you use the rope not the rope.
Happy Days.
| Search AULRO.com ONLY! |
Search All the Web! |
|---|
|
|
|
Bookmarks