Not at all, GMs require a bigger chain and suit bigger boats.
Attachment 131388
Printable View
Not at all, GMs require a bigger chain and suit bigger boats.
Attachment 131388
There are spare turbine shafts beside the generators in many of the power stations. The idea is that when they become unservicable, the one that was installed in the building's generator hall can be used. 100T comes to mind. All I remember is that it's a very big gantry crane.
How'd I know Neistat was going to do something stoopid like that for 2017...