Hi All,
So yesterday the actual build phase started... There was a delay due to some incorrect brackets - but that's all sorted out.. Yesterday they started laying it out:
https://www.aulro.com/afvb/images/im...017/05/210.jpg
Today the scissor lift arrived:
https://www.aulro.com/afvb/images/im...017/05/211.jpg
While tht was happening - the driveway was being finished off.... First job - dig in the re-located drain:
https://www.aulro.com/afvb/images/im...017/05/212.jpg
https://www.aulro.com/afvb/images/im...017/05/213.jpg
https://www.aulro.com/afvb/images/im...017/05/214.jpg
Gravel has been spread out along the remainder of the driveway:
https://www.aulro.com/afvb/images/im...017/05/215.jpg
The lads cracking on:
https://www.aulro.com/afvb/images/im...017/05/216.jpg
In this picture - you can see that they have also installed crushed rock at the rear of the shed (on an angle to aid water run off, and also compacted it down):
https://www.aulro.com/afvb/images/im...017/05/217.jpg
In this picture - you can see the test placement of the rope fence that I am going to install.. This is purely cosmetic - it will stop the dopey horses and humans from going over the edge. I rekon it's going to look nice:
https://www.aulro.com/afvb/images/im...017/05/218.jpg
https://www.aulro.com/afvb/images/im...017/05/219.jpg
The builder says that the shed will be finished by next Friday. The next steps will be:
* Plumber - I'm installing taps at each end of the shed.
* Electrical
* Shelving
* Move in... This in itself is going to be a hell of a lot of work - but great fun.
I'll keep you all posted.
Cheers,
GG.