There is pretty good quality clay with a bit of gravel mixed in.There is a really good gravel pit adjacent to the job with a huge amount of very good gravel.The trainer has got me cutting the hills out and using it as sub base where fill is needed.He says it will save the shire thousands in carting the gravel plus give a better flowing road.I just windrow it up then get a loader and tipper in to shift it to where I need fill.
Got a heap of dirt ready to shift will put a couple of more pics up next week after Ive got it shifted and spread.
That power pole is a beauty!!!! Im ready to set the loader driver up so he backs over it,he backed into whilst grading the other day:mad::mad::mad::mad::mad:.Western power are too shift it,problem is they were all set to shift the wrong pole,next to the exsisting road not in the new road.So all the paperwork/redtape has to be re done:mad::mad::mad::mad:
Andrew