Originally Posted by
isuzurover
I had 1 set done in QLD and one set done in WA. For $40 per rim I couldn't be arsed doing them myself.
The ones I did in QLD were cut and flipped, and the old valve holes welded up. These were +30mm offset.
The ones I did in WA were +20mm - they spun them on a lathe and machined down the flange (as Rigidij mentions above). While they were done very well, I think this method concentrates the load on the rim, which is not ideal. They also welded them up using one continuous weld (not great for crack propagation). However they are very nicely welded and needed almost no lead to balance.