Well the engineer is at it again, all the control unit would be doing is to warming up the gas so that when the high beam circuit activated the Zeon would light up straight away.
Now at a cost of $1,400.00 to be able to turn on a configuration parameter to do that - I bet I could come up with a circuit to do the same - at a cost of max $50.
Another project for the list - dam !
Edit: I bet some one has already done it.
Tor



Reply With Quote

Bookmarks