Might be best if I try it all again tomorrow
I will give another go in the morning.
I will pay particular attention to the Connections to the CPU at both points .. and then again when connecting the LR loom onto the LLams Connectors.
All the rest of it seems to have great connection as I am not putting it in the usual place near the handbrake but adding a / bracket holder under the dash along with a temperature warning alarm.
That way its all able to be connected here and then velcro strapped in place once the loom is connected.
Is there a sequence I can review and then report back to you should the situation remain unchanged.
Many Thanks Graeme
Steve
I will tomorrow take some photos once installed
and then also take a vid and upload with the sequence of calibration and results
perhaps also before connecting I will show the TR working first..?
Thanks Graeme