I have the hydraulic press and dies.
2 hours per side on the floor had it done.
(My hoist hasn’t been installed yet)
Printable View
I have the hydraulic press and dies.
2 hours per side on the floor had it done.
(My hoist hasn’t been installed yet)
Thanks guys I really appreciate the feedback, I'm on the fence about trying this one myself. If I had access to a lift I'd do it, but looks like a pain in the ass on stands.
I'm going to get the guys at Les Richmond to take a look and quote.
It's not that hard in the driveway. My brother has a hoist and is 30 mins drive away. It's a toss up between loading the tools up and driving there and doing it in the driveway at home....Obviously it's easier on the hoist but the 20 mins load tools, 1 hour return travel and 20 mins unload tools, makes the driveway an option.....