- 
	
	
	
	
		It arrived today.
 I have no idea when I am going to find time to tackle this thing.
 I have a lot of work in front of me.
 Some detailed pics following.
 Not too much is missing, but I do have to find a few missing doors, veg steamer and small bits and pieces and ash tray for the boiler.
 The boiler and chassis/ builders plates are missing.
 The chassis is good.......all the sheet metal has to be replaced.
 supprisingly the cleaning tools for the boiler are present as are all the baking trays.
 https://www.aulro.com/afvb/images/im...014/04/925.jpg
 
 
- 
	
	
	
	
- 
	
	
	
	
		https://www.aulro.com/afvb/images/im...014/04/921.jpg
 Above are boiler tools ........ie for cleaning the tubes etc, also shows boiler blow down valve
 https://www.aulro.com/afvb/images/im...014/04/922.jpg
 
 Little door missing from floor level compartment above.
 
 
- 
	
	
	
	
- 
	
	
	
	
- 
	
	
	
	
- 
	
	
	
	
- 
	
	
	
	
- 
	
	
	
	
-