Okay today i managed to have the stainless steel tube welded to the air intake insert so i now have a piece of plate with steel tubes welded to either side . One side inserts internally to the air box, i have siliconed this in place i then installed two locating screws on the flat plate to fix it to the inner guard. The stainless steel pipe which has been squashed to mate with the flat plate and the shape of the inlet to the air filter. I drilled and cut the guard to allow the external piping to be attached. Unfortunately the welding could not be completed today the local welding shop was doing the job in between more important work so i was sidelined today. I did inspect the piping and it is of a very high quality they are to fit the location tabs tomorrow morning and i hope to install the completed pieces. I have supplied some photos of today's work. And i think a couple of thought provoking ones do you think a short snorkel would make a hit check out the photo's in the second post:D.
Gippy:)