Starting from the ground up....
well having enough of folding peices of carboard for the moment, I decided to do some work on my press.
I started with the base/feet. SHS 100x100x9, end caps 100x25 flat bar, feet 50x10 flat bar, face mount 65x10.
I had to oxy all the flat bar and clean up. Vee ground and gapped the 25mm end caps with the SHS. 16mm holes slugged in the feet so a 14mm masonry drill bit will pass through.
GMAW Kemppi 250C, was in the spray transfer, approx 38v 13m/min for the end caps and 32v 10m/min for the 10mm plate.
Next is to Mill the feet flat, the ends square and parrallel and equal length. And Mill the face mount.