I have 2 weeks over the Christmas break to try and restore, overhaul and fix as much of Russell as I can, I have enough parts to keep myself busy that is for sure... watch this space
Printable View
I have 2 weeks over the Christmas break to try and restore, overhaul and fix as much of Russell as I can, I have enough parts to keep myself busy that is for sure... watch this space
Hi All
Well I am finally getting Project Russell back on track
chassis is now complete with welding completed and painted black
Suspension will be on order soon.
Hi All
Project Russell is back on track after a wet summer
Chassis is all welded up with new a new x member front dog legs and an outrigger.
Painted with red oxide and 2 coats of black anti rust
Suspension to be ordered soon
Hi
Brakes, pedals, steering, swivels all coming together nicelly
Attachment 92556 let the painting begin
Project Russell ... Swivel and Hubs overhauled
Attachment 93228Attachment 93229Attachment 93230