I'm back!... For a while.
I got in to the workshop today with the plan of finishing off the 16 flanges and getting the beams tack welded into position. A highly repetitive task considering I had to drill out alllll the holes and then run the tap throught them! And then all the tidying up to get rid of burrs and the like!
4 groups of 4 plates welded together and drilled out:
https://www.aulro.com/afvb/images/im...011/08/845.jpg
All the hole tapping done:
https://www.aulro.com/afvb/images/im...011/08/846.jpg
And to finish up, the flanges for the horizontal beams were tacked in!:
https://www.aulro.com/afvb/images/im...011/08/847.jpg
https://www.aulro.com/afvb/images/im...011/08/848.jpg
Next time will be a bit tricker, as I need to cut the gussets for the 4 corners to stiffen up the frame.
I plan to get another day of work in next weekend. Following that I will be away for a 3 week holiday in Europe :D

