Hello All,
One of the jobs on the "To Do List" will be to make front and rear ladder racks. The mounting points are still in place from the previous owner. The racks must have be fitted to the farmer's new replacement vehicle.
I had to buy a new windscreen washer bottle and related parts. Snowy just came with an empty space where the bottle goes.
I will also be having a crack at making some aluminium-sheet headlight surrounds to replace the cracked and decaying black plastic ones. If the new ones work out okay, I will either paint them black or get them anodised.
Once I have done the timing belt and reinstalled the diesel injector pump, and power steering pump ... , I will take Snowy to a mechanic to see what else needs to be done for a Road Worthy or Safety Certificate.
Kind regards
Lionel


 
					
					 
				
				
				
					 Reply With Quote
  Reply With Quote 
						
					 
					
					
 Originally Posted by LR V8
 Originally Posted by LR V8
					
 
						
					 
			
Bookmarks