A bit more progress to date.
Block cleaned up and prepared for the head to go back on (spot the new bolts)
https://www.aulro.com/afvb/images/im...2013/11/18.jpg
A couple of head bolt threaded holes needed cleaning out. An old headbolt with a line of a thin angle grinding disc through it did the job beautifully.
https://www.aulro.com/afvb/images/im...2013/11/19.jpg
The head's been cleaned up and is back on.
https://www.aulro.com/afvb/images/im...2013/11/20.jpg
Word of warning on workshop manuals - the one I have shows the reverse head bolt tightening order from what it should be. (Bolts should be tightened from the centre of the head (stiffest part) spiralling outwards, rather than from the outside in (as shown in my manual). I'll post a pic of the manual and a source if I can find it.
Rocker arm assembly on, valve clearances set and a 4BD2-T injection pump trial fitted, timing marks aligned
https://www.aulro.com/afvb/images/im...2013/11/21.jpg
Fits well for the most part. As far as I can tell, I only have to modify the throttle cable retainer that's bolted to the oil cooler, in order to match the height of the new pump's speed control (throttle) lever.
https://www.aulro.com/afvb/images/im...2013/11/22.jpg
That and a couple of other things to do before I have to pull the engine and gearbox out of the truck to progress further. It'll have to wait until after next weekend. Hopefully all the other bits and pieces I need will arrive before then.

