Some image of the final ( no Ceramic coating ) pipe install.
Under the bonnet looks standard, all shielding was kept as was the pipe bracket location.
The pipe was cut just short of the cross member to make things a little easier to do. Still took 5 hours for 1 man & the occasional 2nd person.
They made 2 pipes for me, one is away getting the coating inside & out & should be back early next week.
These guys did a great job, very professional outfit just south of Brisbane.
Cheers
Dave

