Yes, the export limit is unrelated to voltage.  For Essential Energy in NSW the single phase limit is 5kw but my installer wanted to set mine lower for no good reason but set it to my requested 5kw.  I also requested access to allow load management changes so now I have full load management and export configuration control via the web page.
Mine's a Primo 8.2 with 8kw of panels that often gets to 8.3kw on bright, cool days when the 3.6kw HWS is heating.  I usually have ON set to very slightly under 5kw to delay switching on as late as possible to maximise export for the day.
				
			 
			
		 
			
				
			
			