W&KO
13th February 2020, 07:55 PM
Pulled into a servo for a driving break and noticed an EV Charging staton.
Thought I would have a closer look....
I don’t get the Deagon, they currently have two bowsers with two cables on each. At best it could only charge three cars, although it may only charge two cars.
There is the capacity to install another four bowser, again the positioning doesn’t loom right to maximize charging.
I than notice each bowser had a red light on top, closer inspection shows all four charge points are out of service. go electric....go anywhere, apparently not.
https://uploads.tapatalk-cdn.com/20200213/5b236b6be52ac51dca7550b83bf79c3d.jpg
Only an engineer could design something like this.
https://uploads.tapatalk-cdn.com/20200213/83fd2196ed0b19761bf2c41c562a9f45.jpg
Thought I would have a closer look....
I don’t get the Deagon, they currently have two bowsers with two cables on each. At best it could only charge three cars, although it may only charge two cars.
There is the capacity to install another four bowser, again the positioning doesn’t loom right to maximize charging.
I than notice each bowser had a red light on top, closer inspection shows all four charge points are out of service. go electric....go anywhere, apparently not.
https://uploads.tapatalk-cdn.com/20200213/5b236b6be52ac51dca7550b83bf79c3d.jpg
Only an engineer could design something like this.
https://uploads.tapatalk-cdn.com/20200213/83fd2196ed0b19761bf2c41c562a9f45.jpg