Originally Posted by
peter5111
Regarding LR not bidding for the Defender replacement, from my understanding of Project LAND 121 , the goal was not just a bunch of Defender replacements.
(I Thought) The overall goal was to have a single manufacturer supply the entire fleet (except specific, specialized vehicles), from small 4x4 vehicles right up to road trains, with everything in between. It wasn't just to supply the vehicles, but also to provide the logistics chain, deeper level maintenance and engineering support for the whole lot of 'em for 25 (?) years.
With that in mind, there are VERY few manufacturers with a product line that could meet the requirement. I don't know if an alliance / consortium of manufacturers was an allowable option.
There are certainly some very good engineering and economics reasons to go down that path, but the cynic in me does wonder why it was written up as a pseudo sole supplier contract..