More done today, but what follows will be it for now, have a few other things that need my attention this week.
First cupboard back in permanently - plumbing required that I won’t have good access to also done. The water pump, accumulator and filter will all life under this cupboard with easy access by removal of the kick panel.
446FCD37-BECF-4FB3-982F-8FA8A72C787B by Gavin Gregory, on Flickr
Also modified this cupboard to fit a pull out rubbish bin.
AAD92382-CF0D-4304-8686-021C064770FA by Gavin Gregory, on Flickr
Drawer base back in and bench top back on.
11E405F3-27EB-416C-BB39-A03B4669094D by Gavin Gregory, on Flickr
BA1C04C9-D5C9-4F46-B639-B4697073ED69 by Gavin Gregory, on Flickr
8C7B7221-9D4D-4153-BCF4-7B432B2F9523 by Gavin Gregory, on Flickr
That’s about the last of the major structural work so I can bring a lot of the stuff back in now. Still have some cupboards and shelves to put in, but they won’t make the mess all this has caused.


 
						
					 
					
					
 
				 
				
				
				
					 Reply With Quote
  Reply With Quote 
						
					
 
						
					 Originally Posted by grey_ghost
 Originally Posted by grey_ghost
					



 
						
					 
 


 [/IMG]
[/IMG] 
			
Bookmarks