    You would really need a structural engineer, but personally I would be saying no.

    As mentioned depending on the size of the wheels and their contact area you are putting a lot of weight on one concentrated point.

    For someone to correctly calculate the bearing capacity of your floor, you would also need the joist and beam sizing, spans and timber grade etc. The whole structure would need to be assessed.

    They would also need the scissor lift specifications including the "ground bearing pressure (xxx kg/cm2)".

    Just my view though.

  2. #12
    Join Date
    Jan 1970
    Location
    Gold Coast
    Posts
    5,101
    Total Downloaded
    0
    32mm is not very common, are you sure? More importantly, what size are your floor hoisted,what span? Continuous, or single? What size are your bearers and span?

    You could have concrete on those joists, but if they are not up to the job it will fail.

  3. #13
    Join Date
    May 2008
    Location
    Bundaberg Qld
    Posts
    7,036
    Total Downloaded
    0
    Dave,

    these little EWPs are probably ideal for what you want. Is the one you (in Victoria) linked the actual one (in NSW) you are looking at ? If so is there anyone that can have a look at it for you and maybe even do a capacity test on the batteries. Other things to look for are wear in the pivots, signs of regular/no maintenace, worn controls (particularly the motion controls), etc.

    Not sure about Victoria, but anything "out of inspection" can usually only be used privately and as Tombie said, they are a bit of a buggar to move around. I still think someone with a red stamp (engineer ) should do some load calculations for your floor at the very least.

    good luck.

  4. #14
    Join Date
    Jul 2008
    Posts
    433
    Total Downloaded
    0
    As everyone says you'll need to do load calcs on the floor, which before you start means everything that been said plus the type of timber and how well seasoned it is. Needs my standards/timber books at work to answer.

    What about practical considerations:

    Is it pine the wheels will mark the floor, especially if there stones grits in them?

    Is this a polished floor the wheels again will damage the polish?

    It's a pine floor (grade unknwon)and typically full of knots the load may dislodges the knot?

    If it's a tongue & groove floor there is a real possibility that the slender tongue will crack under the high concentrated loads, when re-distributing the wheel load to the adjacent board. This may well mean the floor squeaks every time you walk on it afterwards.

    Those EWP's are not meant for bumps: in my experience door sills, etc. edges will stop 'em dead. The ones I've used have out of level trips in them. There meant for shopping centres, etc. with very smooth floors.

    Think you'll need, at a min., thick load spreaders, (like what mobile cranes use) on slabs, to save your floor

    All pretty negative I know, but can help but think that this may lead to a disappointing result.

    Clive

  5. #15
    Join Date
    Oct 2010
    Location
    Ourimbah
    Posts
    409
    Total Downloaded
    0
    I am not a building engineer, however I do work as a contract administrator for a building company.

    Your best option is an aluminium mobile scaffold.
    Last edited by Beckford; 17th November 2011 at 06:00 AM. Reason: Typo

  6. #16
    Join Date
    Jan 1970
    Location
    Normanhurst, NSW
    Posts
    10,258
    Total Downloaded
    0
    ^x2
    I hired some of this al. scaffolding recently to do some home maintenance - about 5.5m up - and it was brilliant. Easy to set-up, adjust for different heights, move around (locking wheels) a good size platform (8' x 5') and generally very easy to use.

    Cost $133 to hire and I had it for a week, which was a slightly 'discounted' rate as when I returned it I informed them that I had done a bit of maintenance on it for them by lubricating the wheels - took all of a couple of minutes.

    Even at the full hire rate, you'd get a lot of usage for the amount you're considering outlaying for the scissor lift, then, as stated, you've got the batteries to maintain.
    Roger


  7. #17
    Join Date
    Jul 2006
    Location
    Brisbane, Inner East.
    Posts
    11,178
    Total Downloaded
    0
    My parent's home in Brisbane had 14' ceilings. Dad and I painted the inside once using normal painter's trestles and planks with bits of timber and carpet as load spreaders to save the floors. Dad painted the place himself only the once. Every time afterwards he got the professionals in. Too big, too high, too much work, he reckoned.
    URSUSMAJOR

  8. #18
    Join Date
    Apr 2007
    Location
    Prospect SA
    Posts
    2,131
    Total Downloaded
    0
    Buying the scissor lift is not the big expense, trust me.
    Wait till hydraulics or electrics go and have to have parts machined up.

    Get a good scaffold, buy it and after a year when no longer needed, sell it for almost what you paid.

    Small lifts need perfectly flat surfaces or their inbuilt alarm will lock down any lift.

  9. #19
    Join Date
    May 2009
    Location
    Tatura, Vic
    Posts
    6,336
    Total Downloaded
    0
    Quote Originally Posted by Brian Hjelm View Post
    My parent's home in Brisbane had 14' ceilings. Dad and I painted the inside once using normal painter's trestles and planks with bits of timber and carpet as load spreaders to save the floors. Dad painted the place himself only the once. Every time afterwards he got the professionals in. Too big, too high, too much work, he reckoned.
    My walls are about 16 foot then from there a high pitched cathedral ceiling.

    Dave.

  10. #20
    Homestar's Avatar
    Homestar is offline Super Moderator & CA manager Subscriber
    Join Date
    Aug 2010
    Location
    Sunbury, VIC
    Posts
    20,105
    Total Downloaded
    0
    Quote Originally Posted by Mr Whippy View Post
    My walls are about 16 foot then from there a high pitched cathedral ceiling.

    Dave.

    That must be a bitch to heat/cool...

    The unit shown in the photos have non marking tyres - the white ones, but as already mentioned, debris stuck in the tyres - stones, screws, etc will do your floor some damage.

    Scissor & boom lifts are usually the only good buy you will get from a Hire company, as they sell them as they hit thier 10 year inspection - they are usually still in pretty good nick, but it costs more than it's worth to do the inspections. Great for personal use, but you can't hire it out to anyone, not a big deal in your case by the sounds of it.

    Also, as mentioned, check the batteries, they are pricey to replace. Good battery maintenance is a must if you don't want to be changing them in a year or so.

    If your floor will hold it, I would say go for it - parts for these are pretty easy to get, and don't cost the world. Rams are rebuildable, bushes can also be replaced.

    Cheers - Gav
    If you need to contact me please email homestarrunnerau@gmail.com - thanks - Gav.

Page 2 of 3 FirstFirst 123 LastLast

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Search AULRO.com ONLY!
Search All the Web!