Results 1 to 10 of 10

Thread: Accommodation - Cooma

  1. #1
    Join Date
    Feb 2008
    Location
    Scarborough, QLD
    Posts
    3,315
    Total Downloaded
    0

    Accommodation - Cooma

    We usually freecamp or stay in national parks, but i need a night of electricity to charge some device.

    Anyone able to provide a spot for the cravan and some 240V in exchange for beer/wine? Or able to recommend a van park in the area?

  2. #2
    Join Date
    Feb 2008
    Location
    Scarborough, QLD
    Posts
    3,315
    Total Downloaded
    0
    looks like the park at Buckenderra will be the go

  3. #3
    Join Date
    Jan 1970
    Location
    Moruya Heads/Sth. Coast, NSW
    Posts
    6,532
    Total Downloaded
    0
    Ryan, looks like it might be time to get a generator, if you're back up this way you can borrow mine over Xmas, Regards Frank.

  4. #4
    Join Date
    Feb 2008
    Location
    Scarborough, QLD
    Posts
    3,315
    Total Downloaded
    0
    Quote Originally Posted by Tank
    Ryan, looks like it might be time to get a generator, if you're back up this way you can borrow mine over Xmas, Regards Frank.
    thanks for the offer, but I'm going with solar panels when I get to melbourne. I need to do the initial charge on my replacement hot water system, which takes 8 hours, hence the neefs for overnight power.

    btw, I replaced my 2 cranking batteries yesterday. 1 of the dud batteries was showing 4V!

  5. #5
    Join Date
    Jan 1970
    Location
    Normanhurst, NSW
    Posts
    10,258
    Total Downloaded
    0
    Good to hear from you again Ryan.

    I've been thinking about you the last week or so and wondering where you were and how the trip was going.

    Do you have a long or short term rough itinerary at all? Just thought we may be able to link up again sometime, somewhere.
    Roger


  6. #6
    Join Date
    Jan 1970
    Location
    Moruya Heads/Sth. Coast, NSW
    Posts
    6,532
    Total Downloaded
    0
    Make sure you have long power leads so you put your solar panels out in the sun and keep yourself in the shade. Come across the new CTEK D250S Dual DC to DC battery charger 20A. It has a built in Solar Regulator so you can plug Solar panels directly into it, which negates having to buy a reulator for the solar panels. Retails for around $370, will be getting my self one, Regards Frank.

    Well that copy and paste didn't work too well, try going to their website.

    \
    rb'SWPRQSUCY


    CIFK
    D2505 D{JAI
    SIMPLE


    SEI & FORGEI CHARGING
    CTEK's


    D250S Duo offers o unique DIY duol bottery system for
    olternotive


    power ond/or solor power ihot soves time ond money.
    FAS'ER


    GIIARGITIG
    The CTEK


    D250S Duol is o 5-step chorger thot outomoticolly odiusts
    the chorging


    voltoge ond current occording to the botiery's stote of
    chorge

    ond temperoture - reducing o bottery's chorge time.
    A


    sensor on the CTEK D250S Duol senses the bottery temperoture
    ond


    odiusts the required chorge by increosing the voltoge in cold
    weother

    ensuring the bottery is fully chorged, ond dropping the
    voltoge


    in hof weother to ovoid the problems of overchorging.
    With


    the CTEK D250S Duol, vehicle owners con be confident
    thot their

    bofi.ery will olwoys receive the optimol chorging voltcge,
    with reduced

    chorge time, while ensuring the bottery will be
    I


    0O per cent chorged
    Fully


    outomotic for optimol chorging
    @
    For


    oll leod-ocid botteries
    'EGIIIUICII
    DAIA
    CHARGING


    VOLTAGE
    CHARGING


    CURRENT
    TYPE


    OF CHARGER
    TYPE


    OF BATTERY
    BATTERY

    CAPACITY
    INSULATION
    ARTICLE


    NUMBER
    14.4Y

    ot 25C
    204
    5


    step, fully outomotic chorging cycle
    12V


    leodccid botteries
    40-300Ah
    lP65


    (splosh ond dust proofl
    56477
    THE


    SMAR,TEST BATTERY CHARGER,S IN THE WORTD
    **mA*\g
    Solor


    ponel + Vehicle ground/Solor ponel
    Alternolor bollery


    + Service bottery +
    FEA'UNEg
    .


    Multi-step chorging from olternotors ond solor ponels
    .


    Botiery seporotor thot eliminotes diodes ond VSR reloys
    .


    Mointenonce chorge of storter bottery
    .


    Solor ponel regulotor with Mqximum Power Point Trocking, synchronised
    with other


    current sources such os the olternoior ond/or wind
    .


    Slmplified insiollotion of remote botteries for bow thrust of onchor winch
    IEIUEFI'g
    .


    Moximised bottery life due to minimised underchorge time
    .


    Moximised boitery copocity by mointoining o positive stote of chorge
    which con leod to


    hormful sulphote crystols on the leod plotes ond
    strotificotion of the bottery

    ocid
    .Ability


    to toke chorge outomoticolly from ony power source thot is
    connected to the


    CTEK D25OS Duol
    .


    Reduced chorging times ond costs by decreosing engine idling
    ond


    the dependency on AC power onshore through efficieni use of
    olternotor


    ond solor power
    .


    Reduced environmentol impoct through extended bottery life
    .


    Minimol instollotion time ond cost
    SUffAITEFOR
    .


    Boots
    o


    Compervons ond RVs
    .4WDs
    .


    Housing thot rely on generotors for extro electricity
    CONPAIIBLEW,]f'/I
    CTEK SMARTPASS
    Error


    lomp Solor power lomp
    Power lomp Service

    bofiery lomp
    Alternotor bottery


    lom p
    $NPLE


    AND A}JONDABLE
    Any


    leisure vehicle with o duol bottery system will benefit from the
    convenience


    ond cost-sovings of the CTEK D25OS Duol. With two DC
    inputs

    - one for olternoior power ond one for solor power - botteries
    con be chorged while


    on the move or when remoining stoiionory.
    The


    simplicity of the CTEK D250S Duol mokes it offordoble os it
    doesn't


    need heovy gouge wiring, con be eosily DIY instolled,
    ond doesn't


    require o solor regulolor, or o VSR.
    By


    konsforming the stondord olternotor into o multi-step device when on
    on+ood or


    morine vehicle begins running, the CTEK D250S Duol
    reduces the rechorge time


    os the bottery is constonily kept in o heolthy
    chorge


    ronge with minimol dischorge. By preventing sulphotion ond
    strotificotion from

    occuning, the D250S Duol helps to increose the
    service life


    of the bottery.
    The CTEK

    D250S Duol olso includes o bottery isolotor thot simplifies
    instollotion


    in ony 1 2V vehicle wiih o duol bottery system.
    SOTAN


    GOTTEGflOIU
    The D25OS Duol


    hos the odditionol benefit of on ouxiliory input
    which con be connected


    directly to solor ponels wiihout the need for
    o


    regulotor, offering free power from the sun.
    D250S


    Duol hos o built-in Moximum Power Point Trocker (MPPT) thot
    helps the solor cells

    produce power os efficiently os possible by toking
    the

    most efficient source of energy from the solor ponels ouiomoticolly,
    ond


    then using the power lo chorge the bottery.
    The

    MPPT seorches for the most effective combinotion of solor cell
    volroge ond


    current, which ensures thot the solor ond olternotor function
    in

    unison to moximise power output.
    EUARANUEED


    QUALIIY WfH C]EK
    CTEK offers


    o 2 yeor guorontee on oll DC/DC chorgers. CTEK customer
    support


    is on opprecioted service, both with regord to generol questions
    or specific

    issues reloted to chorging ond CTEK chorgers. Sofety, simphcity
    ond flexibility chorocterises oll products

    ond solutions developed ond sold
    by

    CTEK. CTEK supply chorgers to more thon 60 countries throughout the
    world.


    CTEK is olso o relioble OEM supplier to mony of the world's most
    prestigious


    co r o nd motorcycle mo n ufocturers.
    Contoct


    customer support: info@ctek.com
    3
    t

    wlww..giek corn 6 THE S'IIARTEST BAITERY CHARGERS IN THE WORLD


  7. #7
    Join Date
    Feb 2008
    Location
    Scarborough, QLD
    Posts
    3,315
    Total Downloaded
    0
    Frank,
    I've been thinking of using one of these, but there's still debates about whether they're necessary/beneficial for charging auxilliary batteries (just ask Drivesafe!). A few auto-elec types have recommended them, but I still see negative comments. Makes it hard for an electronics numpty like me to decide

    Also, I read a review in a magazine somewhere (maybe the one I borrowed off you?) about a new model on the market, that does DC to DC, is a solar regulator, but also does 240V to DC. Can't seem to find a model/maker anywhere though.

  8. #8
    Join Date
    Jan 1970
    Location
    Moruya Heads/Sth. Coast, NSW
    Posts
    6,532
    Total Downloaded
    0
    Well you already have a 240V to DC, the good thing about the CTEK dual is that if you buy Solar panels you usually need to buy a regulator which can cost a few hundred dollars, the CTEK 250S dual has a built in Solar regulator. As you know most of the argument seems to be whether a DC to DC charger is quicker (or not) than the Alternator on the car. I have noticed over time that it takes a lot longer to charge up a Deep Cylce battery and if you don't drive continously four several hours then they don't get a full charge. Fro $370 (approx.) you get a DC to DC charger and a Solar reg. in one unit, I priced a similar Redarc unit and it was nearly $600 and another was $1500, anyway it's something to consider. I didn't show you my Genny did I, it's a clone of the Honda 1000 W, nice and quiet too, around $375, Regards Frank.

  9. #9
    Join Date
    Feb 2008
    Location
    Scarborough, QLD
    Posts
    3,315
    Total Downloaded
    0
    Yeh, my CTEK 15000 is great for 240V, but I'd like to be able to carry only 1 charger if possible.

    I've avoided a genny, as it would be another motor for me to maintain, I'd need to carry petrol, and I simply don't have the room!

    I reckon with the new batteries, and a couple of well mounted or portable panels, I'd be sorted.

  10. #10
    Join Date
    Jan 1970
    Location
    Moruya Heads/Sth. Coast, NSW
    Posts
    6,532
    Total Downloaded
    0
    They would have to be portable as you certainly wouldn't be able to park in the sun all day, make sure the solar panels come with a regulator, it needs to be mounted as close to the battery as possible, Regards Frank.

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Search AULRO.com ONLY!
Search All the Web!