I'm asking about sealers because I'm not entirely happy with the finish of the slab. I poured a slab myself & used a hired trowelling machine in my last shed & the finish was 10 times better than what I have now.
Apart from the surface being covered in cracks (and some getting bigger with time), the shed is nearly done.
They're still dragging it out though. I thought they'd be keen to get this one over & done with to get rid of me, but no. Tomorrow is 3 months since they started erecting the shed & they've been here about 5 days all up.
Still to do:
Fix corner flashings.
They fitted the 4.2m corner flashings with 3 screws & they flap about in a breeze.
Replace 2 x roof sheets.
They ran out of roof sheets & fitted one of the cover sheets & thought I wouldn't notice. They didn't even scrub out the 'cover sheet' writing. Another sheet was buckled during fitment.
Install 2 x concrete access ramps.
http://www.aulro.com/afvb/attachment...3&d=1424344682
There's also approx. $500 of material (knee braces & ceiling battens) that they haven't used which will be coming off the final bill.
I swear, if Wikipedia had a page on Cowboy Builders, their company logo would be front & centre :angry:.