Page 3 of 5 FirstFirst 12345 LastLast
Results 21 to 30 of 43

Thread: Impressive haul truck

  1. #21
    Join Date
    Feb 2007
    Location
    Perth
    Posts
    3,918
    Total Downloaded
    0
    Quote Originally Posted by BMKal View Post
    The system that Rio uses for their trucks has been developed jointly with Komatsu
    Wife was former Rio Chief Commercial Officer to this project - very messy when came time to sort out who owed what in respect to IP for commercialisation purposes.
    2024 RRS on the road
    2011 D4 3.0 in the drive way
    1999 D2 V8, in heaven
    1984 RRC, in hell

  2. #22
    Join Date
    Mar 2007
    Location
    Kalgoorlie WA
    Posts
    5,546
    Total Downloaded
    0
    Quote Originally Posted by ramblingboy42 View Post
    Dougal, it's exactly the opposite, with 30 min changeovers on major drivetrain items.

    Yes - definitely less time off the road with this concept, due to the "modular" nature of all drivetrain components. In theory, it is streets ahead of what is currently in use (provided of course you have spare "modules" on site).

    Once any company decides to run with this type of vehicle concept and modifies their ROM they will be in front of their competitors.

    Blackwater mine in Qld use Cressis for their "long haul" but still have tyre issues.

    This new concept will basically eliminate tyre issues...ie fires etc.

    Not with today's current tyre technology. One of the main reasons why this concept is yet to proceed is that the tyres required for the duty of these trucks have yet to be developed. Even with the development of a suitable tyre (if it ever happens) - the possibility of tyre issues such as separation / tyre fires etc will not be eliminated by this concept. Those issues may eventually be eliminated by tyre design - but that applies equally to all types of haulage trucks.

    Drivers are a real problem in the mines. They are just guys...and girls.....like you and I and are expected to work like robots.

    This new concept will also eliminate a lot of driver problems as well.

    No different to what is currently happening with Komatsu / Caterpillar.

    They will be built...the mining companies can't afford not to have them.[/COLOR]

    If it ever happens, I believe it will not be in our lifetime.
    What are "Cressis" ? Only thing I could find in google is scuba diving gear.
    Cheers .........

    BMKAL


  3. #23
    Join Date
    Feb 2007
    Location
    Perth
    Posts
    3,918
    Total Downloaded
    0
    'Cressies' - Kress Corporation
    2024 RRS on the road
    2011 D4 3.0 in the drive way
    1999 D2 V8, in heaven
    1984 RRC, in hell

  4. #24
    Join Date
    Mar 2007
    Location
    Kalgoorlie WA
    Posts
    5,546
    Total Downloaded
    0
    Quote Originally Posted by Ferret View Post
    Wife was former Rio Chief Commercial Officer to this project - very messy when came time to sort out who owed what in respect to IP for commercialisation purposes.
    That's interesting. I never had anything to do with the automation / remote control of the mining gear or the railways. But I often wondered who owned the "rights" to the control systems for the crushing plant. The actual DCS that we (HWE / Leighton) installed to control the plant was Citect - but the interface between Citect and the operator control panels in Perth was I believe a Rio Tinto "in-house" system.

    Must say that I was very impressed with Rio's on-line training system. I had a lot to do with getting the relevant training materials into this system - it's by far the best that I have seen in the industry (runs rings around "The Big Autralian"). Their integration of this system with SAP gives them incredible management of the training and skills levels of employees and contractors on their operations, and provides employees with the ability to undertake training for new roles, and then to seek promotion / advancement, from any work area.
    Cheers .........

    BMKAL


  5. #25
    Join Date
    Dec 2007
    Location
    South East Tasmania
    Posts
    10,705
    Total Downloaded
    0
    BM Kal which kind of engine and power have the truck that is on the haulage train?
    There are few tons to town there including the weight of the rig!!

  6. #26
    Join Date
    Jun 2008
    Location
    The new Gold Coast, after ocean rises,Queensland
    Posts
    13,204
    Total Downloaded
    0
    Quote Originally Posted by BMKal View Post
    What are "Cressis" ? Only thing I could find in google is scuba diving gear.
    try these............

    https://www.google.com.au/search?q=k...w=1366&bih=599

  7. #27
    Join Date
    Jan 1970
    Location
    South Yundreup,WA.
    Posts
    7,468
    Total Downloaded
    0
    My understanding is that these trucks do exist but so far only a couple of prototypes. They are based on the same chassis as the Russian Missile Carriers. I was also informed that there was one - only a single in Australia on trial at present, but the cost involved on setting up a 5 unit system was upwards of $30 million, though with both Cat and Komatsu proposing no more sales of trucks to companies but hire based on a % of commodity prices could get real interesting.
    2011 Discovery 4 TDV6
    2009 DRZ400E Suzuki
    1956 & 1961 P4 Rover (project)
    1976 SS Torana (project - all cash donations or parts accepted)
    2003 WK Holden Statesman
    Departed
    2000 Defender Extreme: Shrek (but only to son)
    84 RR (Gone) 97 Tdi Disco (Gone)
    98 Ducati 900SS Gone & Missed

    Facta Non Verba

  8. #28
    Join Date
    Mar 2007
    Location
    Kalgoorlie WA
    Posts
    5,546
    Total Downloaded
    0
    Quote Originally Posted by Chucaro View Post
    BM Kal which kind of engine and power have the truck that is on the haulage train?
    There are few tons to town there including the weight of the rig!!
    Arthur, the prime movers and power trailers generally have 600 horsepower Cummins engines, matched to Allison automatic transmissions.

    The ones on the site where we are (not sure how many they have now - was 11 trains a while back but I think that final number is 15 trains) only run one power trailer in each consist - so a total of 1,200 horsepower for each train. I have seen other applications using a prime mover and two power trailers - total of 1,800 horsepower. I am not sure whether this is the maximum that they can run in a single consist. The biggest of these that I have seen consisted of prime mover and 7 trailers at The Granites Gold Mine in the NT - but pretty sure that these had no more than two power trailers in each road train.
    Cheers .........

    BMKAL


  9. #29
    Join Date
    May 2013
    Location
    Brisbane
    Posts
    114
    Total Downloaded
    0
    Quote Originally Posted by BMKal View Post
    Caterpillar's largest model currently is the 797 - but I don't know of anyone who actually has any of these in Australia - it's hard enough getting tyres for the smaller 793's (of which there are now plenty in Australia).
    BMA uses 797's up in the Bowen Basin.

  10. #30
    Join Date
    Sep 2007
    Location
    Kiwiland
    Posts
    7,246
    Total Downloaded
    0
    Quote Originally Posted by Chucaro View Post
    Do you think so?

    I'm not seeing a connected train as an efficiency gain. In most places it would be a loss.
    Individual trucks can be run spaced to the point where the loader or excavator finishes one and starts on the other. The one just loaded is already a decent way up the road before the next is loaded and ready.

    With them tied together you've got work-flow issues (no truck can leave until they're all full), movement issues (huge turning circle compared to a rigid truck) and any material dropped between the trucks while loading becomes a big problem.

Page 3 of 5 FirstFirst 12345 LastLast

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Search AULRO.com ONLY!
Search All the Web!