well went back to capral and bought 2nd length of 6.5m, mapped out how many cnr pieces were needed 18 in total and got them at same time. this was purchased today. all cut, deburred, filed, cleaned up, hammered into position, quite time consuming work but finally the frame is complete and fits nicely into the rear of the D3. made one side larger to give me access to the bolt for spare tyre otherwise if it were two identical drawers would of fouled on the access.
pic temp install, next to look at tie down mechanisms to attach to tie down points in D3. having made another for the D2a, this is the hard work done, the rest is easier to do. taking my time as i want to get it right for my application. have secured some black plastic handles for the two drawers. unsure about sliding mechanism, had runners before but they are expensive and heavy. trying to keep weight low. cheers


 
					
					 
				
				
				
					 Reply With Quote
  Reply With Quote 
						
					 
				

Bookmarks