Originally Posted by
Pedro_The_Swift
Being lithium I'm sure it has a BMS,,
can I access it??
No...
I put a meter on the connected batts this morning,( dont ask... ;( )
the Victron software was around ONE volt higher than the meter..
The cable running from the controller to the batts is the same from the roof panels to the controller( and NOT upgradable... no point the Victron wont accept bigger cable)
5mm external Dia..
cable run from controller to batts?
maybe 4m ??
waiting on Mitre10 to open, need longer M8 bolts on the batt terminals,
Bought a Victron BMV700, probably be 3 weeks before I can get it installed though...