30th October 2014, 07:15 PM
#31
What are your regs for burying cables? Over here it is 600mm deep with a layer of dirt and then danger tape. I presume it's the same in Australia?
-
30th October 2014, 09:12 PM
#32
Yep, same. I completely forgot about this thread, been to busy in my own little world. Will size it up when in the office next (if I remember)
-
1st November 2014, 09:38 AM
#33
ok, after the rush of responses to calculate the cable size i've downloaded 'gencalc' to have a few guesses. 
put in 40A current per phase (interpreting forum responses is this correct so in total 80A for the two phases in total?)
voltage 240v
5% voltage drop
330m run of cable
single core
underground in single duct
single phase
it comes up with min size 50mm Cu (70mm Alu) which i need 2 of plus neutral (same size?)
or do i put it in as 480 volt which for for 80A comes up same size Cu cable but Alu goes to 95mm?
or third, i've got no idea what i'm doing?
-
1st November 2014, 11:04 AM
#34
-
1st November 2014, 11:20 AM
#35
OK, I punched in,
330m
4% volt drop
480V
100A
100Amp c/breaker
buried in conduit
XLPE
70mm2 copper (x3)
95mm2 aluminium (x3)
I wouldn't go any smaller personally.
-
1st November 2014, 11:34 AM
#36
cool !
service with a smile 
what size conduit will they fit in?
thanks vern. now i can have a look at the $
-
1st November 2014, 03:07 PM
#37
some rough numbers just for cable costs :
70mm say $9.9 metre
70mm XLPE COPPER [XLPE70] - $11.00 : Electrician Supplies, ready and available for you online right here
cable cost $9801 for 330 metres
50mm say $6.6 metre
50mm XLPE COPPER [XLPE50] - $7.70 : Electrician Supplies, ready and available for you online right here
cable cost $5841 for 295 metres + say $600 for pole = $6441
difference $3360 so not worth sneezing at if get a pole put in to reduce span
caveat - dropped amps to 80A and voltage drop to 4.1% from vern's figures so kinda shows there's merit in looking at the pole option. i'll have instantaneous gas hot water, gas hot plates and wood heating so have to understand if 100A a necessity. anyway will now have to find a sparky who can actually communicate and discuss options! 
thanks for responses vern & everyone else.
-
1st November 2014, 04:06 PM
#38
Aluminium I say, would be 1/3 the cost. Actually I have my price for th 95mm on my computer, I bought 660m of it the other day. However I would prefer to pm you the cost.
-
1st November 2014, 04:32 PM
#39
Pibby,
Not wanting to derail your deliberations, but why not drop the idea of connecting to the grid and install a stand-alone system based on solar and maybe a small wind turbine.
Not sure what you pay for power and connections in Tassie, but in SA, it's often cheaper to install solar and battery backup rather than pay for bloody expensive poles and/or underground cables, then pay more than 30 cents per kWh thereafter.
Strongly suggest you get a quote from a reputable (and communicative!) solar installer to see what the price comparison might be. The panels are now very cheap, and prices for Lithium Iron batteries are falling steadily. They're virtually maintenance free compared with the old battery technology.
Good ,luck,
Alan
-
1st November 2014, 05:09 PM
#40
Pibby, I can quote that for you as well😊. Seriously, to be done properly, it will be more than 3 times the cost of going on the grid, and a lot more headache.
My motto for stand alone customers is "a friend for life".
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
Search AULRO.com ONLY!
|
Search All the Web!
|
Bookmarks