Thanks to Dave for posting up the way he fitted his. Which can be found here:
http://www.aulro.com/afvb/projects-t...epertator.html
However, Stuart (Iggy) came over this arvo, so I thought I would post some pics of the EASY way to do it...
Time required: 1.5-2 hrs (this included taking pics and drinking beer

)
Parts WE used (you can do it differently)
1x Provent housing and element
1x One way valve
about 400mm of 1/2" hose
about 750mm of 1" hose
8x hose clamps (4 for each size)
1x Brass 1/2" hose tail/barb fitting (1/4" BSPT thread)
50x50x3mm aluminium angle
3x M8 bolts
Tools needed:
8mm spanner/socket
12&13 mm spanners
24mm spanner
screwdriver
Drill + drill bits
1/4" BSPT tap (not 100% necessary)
Brazing equipment
Parts we SHOULD have had but didn't - 19mm to 1" adaptor (x2), Brass or plastic.
Pics and method to follow...
Bookmarks