Bit of a progress report.
Fuel tank cleaned out, painted and installed, tub and seat box painted and fitted, new brake lines manufactured and installed with new slaves and shoes,screen cleaned up and bolted on, radiator tanks remove, core rodded tanks soldered back on and installed. Wiring loom run.
https://www.aulro.com/afvb/images/im...012/12/833.jpg
https://www.aulro.com/afvb/images/im...012/12/834.jpg
https://www.aulro.com/afvb/images/im...012/12/835.jpg
Hi Wayne, which week beers getting hot.

