You would have to drill new holes yes. I replaced my whole rear floor with 4mm check plate so I had to drill new holes either way.
You would have to drill new holes yes. I replaced my whole rear floor with 4mm check plate so I had to drill new holes either way.
An old thread but does anyone know if you are able to source the original sized lash down rings located on the tub floor of the RFSV?
Would like to replace mine otherwise I will try blasting and possible galvanising if there is enough metal left.
Regards Warrick.
"Any intelligent fool can make things bigger and more complex....It takes a touch of genius and a lot of courage to move in the opposite direction."
Albert Einstein.
| Search AULRO.com ONLY! |
Search All the Web! |
|---|
|
|
|
Bookmarks