Oh man, that brings back memories. I have used a 44 full of water, 3 star pickets, a lump of wood and some rope to make a load bank to test a genset. The more water, the more load. Was testing a 40KVA genset and got the sucker close to full load for 15 minutes before the water boiled.
On a slightly safer one, there was a giant soda pot starter on the main bucket chain on an old dredge at Yallourn open cut when I was a second year apprentice there. We had to overhaul it as part of the dredge upgrade. The pots were driven up and down by a 3000:1 reduction drive. Fun times.![]()








Bookmarks