-
10th April 2014, 03:58 PM
#21
It arrived today.
I have no idea when I am going to find time to tackle this thing.
I have a lot of work in front of me.
Some detailed pics following.
Not too much is missing, but I do have to find a few missing doors, veg steamer and small bits and pieces and ash tray for the boiler.
The boiler and chassis/ builders plates are missing.
The chassis is good.......all the sheet metal has to be replaced.
supprisingly the cleaning tools for the boiler are present as are all the baking trays.
-
10th April 2014, 04:00 PM
#22

Above is slow/warming oven

Above is main fast oven with splash back trays for cooking on the move.
-
10th April 2014, 04:02 PM
#23

Above are boiler tools ........ie for cleaning the tubes etc, also shows boiler blow down valve

Little door missing from floor level compartment above.
-
10th April 2014, 04:04 PM
#24


Boiler firebox.......some sort of ash pan missing.

Roof needs much work......roof slides open over boiler for hot weather.
-
10th April 2014, 04:06 PM
#25

Rear wood work bench and fire wood compartment underneath.

Gauge missing from boiler

meat and veg steaming pots, one pot is missing.
-
10th April 2014, 04:08 PM
#26

Numbers under old paint

Wooden benches and fire wood storage again.

Boiler feed water tank.....has removable top for cleaning.
-
10th April 2014, 04:10 PM
#27



Above is boiling/hot water tank for tea and washing up etc.....note red steam pipe going inside it.
-
10th April 2014, 04:13 PM
#28

brackets for safety chains missing above.


-
10th April 2014, 04:19 PM
#29

The above is the hand pump for filling the boiler.

Air tank for brakes.

Some sort of air brake valve.
-
10th April 2014, 04:21 PM
#30
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
Search AULRO.com ONLY!
|
Search All the Web!
|
Bookmarks