Page 9 of 19 FirstFirst ... 7891011 ... LastLast
Results 81 to 90 of 183

Thread: My OO Scale Model Train set Build.

  1. #81
    Join Date
    Dec 2007
    Location
    Back down the hill.
    Posts
    29,773
    Total Downloaded
    0
    How will you maintain contiguity across the bridge, Gav? Pigtails on the hinge end?
    A single source for DCC should sufice, shouldn't it?
    If you don't like trucks, stop buying stuff.
    http://www.aulro.com/afvb/signaturepics/sigpic20865_1.gif

  2. #82
    Homestar's Avatar
    Homestar is offline Super Moderator & CA manager Subscriber
    Join Date
    Aug 2010
    Location
    Sunbury, VIC
    Posts
    20,105
    Total Downloaded
    0
    Yep, spot on Ian, just some wires running from the hinged end, but they’ll also be some switching involved so I can’t accidentally run a train off the end or into the raised section. This will just entail some contacts that will isolate the last section before the bridge, so when broken, any train running into the last 1/2 meter or so will just stop dead. DCC makes life very easy for things like this, 2 wires and I have the 3 tracks sorted. 👍

    Each section of track - even on the bridge will have its own set of droppers running to a main bus, but at the end of the day, it’s just those 2 wires that are needed. Points get trickier as you have to switch the frog power when the switch changes so there’s 5 wires involved for each point, with 2 running back to the switch from each - they’ll be around 30 odd points on the layout all up, so it will still be a jumble of wiring, but I’ll show all that later.

    Not doing any PC sectional control or anything, so it will be fairly simple electrically. (To start with) 😇
    If you need to contact me please email homestarrunnerau@gmail.com - thanks - Gav.

  3. #83
    Homestar's Avatar
    Homestar is offline Super Moderator & CA manager Subscriber
    Join Date
    Aug 2010
    Location
    Sunbury, VIC
    Posts
    20,105
    Total Downloaded
    0
    No pic today, but a quick update. The baseboards are 100% finished as far as woodwork goes now, including the bridge section. Still waiting on the XPS foam which should be here mid week and some magnets to latch the bridge section in the down position to make absolutely sure it stays flat over the transition. Have also ordered some spring contacts for the switching of the track either side of the bridge.

    As the bridge doesn’t have foam going on it, I could actually start laying the track on it - given its only going to be 2 tracks straight across it at the moment (a third may be added later) then there’s no reason I couldn’t do this.

    Will see what tomorrow brings.
    If you need to contact me please email homestarrunnerau@gmail.com - thanks - Gav.

  4. #84
    Homestar's Avatar
    Homestar is offline Super Moderator & CA manager Subscriber
    Join Date
    Aug 2010
    Location
    Sunbury, VIC
    Posts
    20,105
    Total Downloaded
    0
    So tomorrow is now today and I spent the day laying out an overview of the track on the boards and laid the track across the bridge. This took a long time as I’m doing things different on this - all corners will have correct easements leading into and out of them. This means a bit of math and some extra time but you end up with curves that look like the real thing - using the same guidelines Engineers use to design real railways. Basically the first 30% of the curve ‘eases’ into the corner at a diminishing radius.

    This guy explains it well if you have the time - his how to’s are very good and easy to understand.


    Anyway, got the cork laid for the 2 mainline tracks across the bridge and one track glued down too, but this is now drying so no more to do today.

    A couple of pics -

    One side of the cork glued down and drying
    Untitled by Gavin Gregory, on Flickr

    A shot from above -
    Untitled by Gavin Gregory, on Flickr

    Both sides of the cork glued down. This gives a good view of how gentle the curves start at -
    Untitled by Gavin Gregory, on Flickr

    For the eagle eyed, no, this isn’t a prototypical width for track spacing for 00 - I might tighten this up a bit on the main boards depending on rolling stock clearances - 00 gauge is a bit of a compromise when it comes to this. I’m running 55mm here between track centres whereas it should be 45mm. I think my curves will allow closer spacing, my minimum radius on the mainline is 600mm - slightly over a third radius bend, which I’m pretty happy with.
    If you need to contact me please email homestarrunnerau@gmail.com - thanks - Gav.

  5. #85
    Join Date
    Apr 2011
    Location
    Wandong,Victoria,Australia
    Posts
    3,380
    Total Downloaded
    0
    Looking fan-bloody-tastic Gav!
    88 Perentie FFR - Club Rego
    93 Discovery 1 200 Tdi - Club Rego
    03 130 Td5 Single Cab
    06 Discovery 3 Petrol
    22 Defender 90 - Full rego

  6. #86
    Join Date
    Jan 1970
    Location
    Adelaide Hills. South Australia
    Posts
    13,349
    Total Downloaded
    0
    Some people used to do it solely for the glass of beer but that got knocked on the head for various reasons. Mind you, not for me Gunga Din.

    I suppose it was ok for the old blokes that went, in days of yore, all they had to do was let the horse find it's way home.

    Gav, I hope you are going to install buffer stops at the end otherwise the locos will finish up on the lawn.

  7. #87
    Join Date
    Dec 2007
    Location
    Back down the hill.
    Posts
    29,773
    Total Downloaded
    0
    Ron seems to have omitted a transition on both ends of the curve.
    If you don't like trucks, stop buying stuff.
    http://www.aulro.com/afvb/signaturepics/sigpic20865_1.gif

  8. #88
    Join Date
    Jan 1970
    Location
    Adelaide Hills. South Australia
    Posts
    13,349
    Total Downloaded
    0
    Neat little telegraph poles Gav. Just needs wire.

  9. #89
    Join Date
    Sep 2010
    Location
    The Hills.
    Posts
    19,175
    Total Downloaded
    152.79 MB
    Quote Originally Posted by 4bee View Post
    Neat little telegraph poles Gav. Just needs wire.
    Luke will tell him how...
    ​JayTee

    Nullus Anxietus

    Cancer is gender blind.

    2000 D2 TD5 Auto: Tins
    1994 D1 300TDi Manual: Dave
    1980 SIII Petrol Tray: Doris
    OKApotamus #74
    Nanocom, D2 TD5 only.

  10. #90
    Homestar's Avatar
    Homestar is offline Super Moderator & CA manager Subscriber
    Join Date
    Aug 2010
    Location
    Sunbury, VIC
    Posts
    20,105
    Total Downloaded
    0
    So track dried overnight so here’s a pic of the first bit. Can’t lay any more until I get the foam, so now it’s back to planning.

    197A1269-7087-48A4-BCBD-6E904800475B by Gavin Gregory, on Flickr

    Below shows the LH side of the layout as planned - it may change slightly but it will be close. Only 2 points here, so these will be controlled manually by a linkage to the side of the baseboard. You can see the mainline running around - this drops level 30mm to go under the branch line at a grade of 2% and the branch line goes up and over at a very unrealistic 6% but for the small goods trains that will be fine - I’m not trying to be prototypical here and when I laid out that grade to check it, it didn’t look too bad to the eye. The branch line will continue up then run across the back of the layout at a higher level with a large hill in the corner. It will then come back down and loop around the back RHS and come back down to the main level there.

    There will be a flint mill or something similar between the branch line and the canal with it servicing both forms of transport. As I’m modelling this in the early 50’s it was the end of the canals but they were still being used commercially then.

    F76D60B4-1A59-45E7-B62B-8E0F654448CA by Gavin Gregory, on Flickr

    The rest of this board will be rolling countryside, etc. At the top of the pic where the main board is, this will be the town and to the far right of that the main maintenance yard with turntable and roundhouse. Will hopefully start laying that out tomorrow night. The main fiddle yards will be opposite the canal near the window and will house all the rolling stock so this is where the majority of the points will be.
    If you need to contact me please email homestarrunnerau@gmail.com - thanks - Gav.

Page 9 of 19 FirstFirst ... 7891011 ... LastLast

Tags for this Thread

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Search AULRO.com ONLY!
Search All the Web!