Page 2 of 2 FirstFirst 12
Results 11 to 16 of 16

Thread: Project Russell

  1. #11
    Join Date
    Apr 2014
    Location
    Australia
    Posts
    426
    Total Downloaded
    0
    I have 2 weeks over the Christmas break to try and restore, overhaul and fix as much of Russell as I can, I have enough parts to keep myself busy that is for sure... watch this space

  2. #12
    Join Date
    Apr 2014
    Location
    Australia
    Posts
    426
    Total Downloaded
    0

    Project Russell - Full Steam Ahead

    Hi All

    Well I am finally getting Project Russell back on track

    chassis is now complete with welding completed and painted black

    Suspension will be on order soon.
    Attached Images Attached Images

  3. #13
    Join Date
    Apr 2014
    Location
    Australia
    Posts
    426
    Total Downloaded
    0

    Project Russell - Back on track

    Hi All

    Project Russell is back on track after a wet summer

    Chassis is all welded up with new a new x member front dog legs and an outrigger.

    Painted with red oxide and 2 coats of black anti rust

    Suspension to be ordered soon
    Attached Images Attached Images

  4. #14
    Join Date
    Apr 2014
    Location
    Australia
    Posts
    426
    Total Downloaded
    0

    Project Russell - Update

    Hi

    Brakes, pedals, steering, swivels all coming together nicelly
    Attached Images Attached Images

  5. #15
    Join Date
    Apr 2014
    Location
    Australia
    Posts
    426
    Total Downloaded
    0
    uploadfromtaptalk1428472041538.jpg let the painting begin

  6. #16
    Join Date
    Apr 2014
    Location
    Australia
    Posts
    426
    Total Downloaded
    0

Page 2 of 2 FirstFirst 12

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Search AULRO.com ONLY!
Search All the Web!