Starting with the biggest bits:-
The removable cross member of the Stage 1 supports the gearbox and is bolted onto the chassis with 4 bolts. This turned out to be much easier than I was expecting. Surprisingly the bolts came free quite easily and the cross member dropped out with a little bit of leverage at each end. I was expecting much more of a fight.
The front section of exhaust pipe comes next. The manifold nuts were new (because the old ones had vibrated off!) so they were easy to remove but I had to grind out a couple of the bolts on the coupling. Then with a bit of wiggling (thats a technical term) the front section came out. There is a hole under the bottom hanger that I'll need to weld over but otherwise the pipe looks ok. I'm considering welding in a flexible coupling into the down section near the manifold. Not sure if anyone has had success with this - there is not much straight pipe to play with. But anything that will decouple the vibration of the ISUZU engine from the rest of the car has got to be a good thing...




 
				
				
				
					 Reply With Quote
  Reply With Quote


 
					
					 Originally Posted by captainslow
 Originally Posted by captainslow
					
 
						
					



 
				




 
				




 
				




 
				
Bookmarks