-
25th June 2008, 09:09 AM
#41
I've almost completed all the jobs on my list
1) Fitted TJM Airtec snorkel
2) Fitted Milford cargo barrier
3) Flushed cooling system and ran a dose of chem-i-weld
4) Replace old cooling system hoses with my new ones (Decided against this, will just keep them as spares for this trip)
5) Replace old intercooler hoses with my new silicone ones (Decided against this, will just keep them as spares for this trip)
6) Refilled cooling system with 50% glycol - 50% water mix
7) Done engine oil & filter change
8) Fitted new fuel filter & drained rear seperator
9) Done gearbox oil change
10) Changed oil in both diffs
11) Changed oil in transfer case
12) Changed oil in swivel housings
13) Repacked bearings on float
14) Rotated tyres on truck and float
15) Fitted low coolant alarm
16) Put some metho in the windscreen washer bottle (Today if I remember)
17) Fit new wiper blades (Today)
18) Fit 2 jerry can holders above mudguards on float (Today)
19) Put the ponies on and go to the weighbridge (Today)
20) Test fit snow chains (Today)
21) Fuel up (Friday)
22) Raise tyre pressures for towing (Friday)
23) Pack (Friday)
24) Attach Float (Friday)
25) Drive....... (Saturday)
I'm glad I started getting jobs done early, this trip has really caught up with us quickly!
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
Search AULRO.com ONLY!
|
Search All the Web!
|
Bookmarks