you want a brass barbed t piece fitting for down at the turbo end, a length of about 5 inches or so of the high temperature type hose and a barb to olive joiner to suit that and about 1/8th inch Nylon pressure line.
I lazily just fitted the hose they supplied to the plastic barbs they supplied and on a trip about 8-10 months later the hose melted and after cutting and fixing that the t piece split I replaced it with the same (cause I had them on hand on the side of the road) only to have the hose let go about 8 months later again and then the tpiece let go on the way to cooma.
when that happend there was no waste gate actuation and I got stuffed into limp mode after an over boost.... Not fun especially when trying to climb hills with more than 2t of trailer behind me...
Ive now got hose clamped high temp hose on brass fittings that leads away from the heat to the normal 1/8th hose that came with the gauge.


Reply With Quote

Bookmarks