A quick update, all of the port Kembla unions have for the past month been in negotiations and mediation in an effort to save the steelworks. We today voted to cut around 370 jobs and freeze our pay for 3 years, along with other restructure measures, which will save around 50-60 million. This was the target of bsl on the labour component of the 200million overall, 30 million was to come from payroll tax cut and the rest from other sources.
With the numbers to be cut from my department, less than 1/3 want to go so the others will be forced to either transfer, other areas have more who want to retire than can go, or be forced redundancy. There are going to be interesting times ahead.
A few quick points.
Both our CEO, O Malley and pollies from both sides and levels have massively underquoted the amount of steel the Govt use each year at "around 100,000 tons". A study that has just been completed by bismetal /gong uni for the first time ever puts the figure at 1.3to 1.5 million tons a year!
Further Bsl just lost an anti dumping case when the same case was run against the same company and products in both the USA and Canada they introduced tariffs from 20-90% on those dumped steel plate products. Meanwhile we do nothing.:(

