Thread: Big storm and no power in SA

  1. #1311
    Join Date
    Sep 2012
    Location
    Adelaide Hills
    Posts
    13,383
    Total Downloaded
    0
    Quote Originally Posted by bee utey View Post
    Simple ignorance on the part of the grid/plant managers, fixed now.

    but earlier you said



    Originally Posted by bee utey
    Good thing that there are competent people running the grid,
    Originally Posted by bee utey
    Good thing that there are competent people running the grid,
    Current Cars:
    2013 E3 Maloo, 350kw
    2008 RRS, TDV8
    1995 VS Clubsport

    Previous Cars:
    2008 ML63, V8
    2002 VY SS Ute, 300kw
    2002 Disco 2, LS1 conversion

  2. #1312
    Join Date
    Apr 2009
    Location
    Crafers West South Australia
    Posts
    11,732
    Total Downloaded
    0
    Quote Originally Posted by Eevo View Post
    but earlier you said



    Originally Posted by bee utey
    Good thing that there are competent people running the grid,
    Originally Posted by bee utey
    Good thing that there are competent people running the grid,
    People competent in old style grid management learnt how to handle wind power, now they're competent in handling wind power. Learning is what most intelligent people do to become competent in new systems. Heard of this technique, have you?

  3. #1313
    Homestar's Avatar
    Homestar is offline Super Moderator & CA manager Subscriber
    Join Date
    Aug 2010
    Location
    Sunbury, VIC
    Posts
    20,105
    Total Downloaded
    0
    Re large solar and the grid - I work with this a lot and while large amounts of solar is a challenge to the supply authorities, they can cope with it and what is planned - it just means other things within the system need to be updated along the way in the zone subs where it becomes an issue. Not insurmountable by any means. When Islanding a section of the grid for maintenance and running it off large gensets it becomes more of an issue but again - a known one and they can work around this too. There are whole towns in rural Vic that output far more power than they use each day now - the grid was modified to cope - it’s usually around the old systems never being designed for current to run the opposite direction.
    If you need to contact me please email homestarrunnerau@gmail.com - thanks - Gav.

  4. #1314
    DiscoMick Guest
    I read that installing battery banks at sub stations may be one way to stabilize the grid by storing power locally.

  5. #1315
    Join Date
    Apr 2009
    Location
    Crafers West South Australia
    Posts
    11,732
    Total Downloaded
    0
    Quote Originally Posted by DiscoMick View Post
    I read that installing battery banks at sub stations may be one way to stabilize the grid by storing power locally.
    That's right, but the batteries can be anywhere within a grid area and add to stability. Households, small businesses and industrial premises can have batteries installed that can trade power to keep the grid stable too. And if the grid goes down it's still of use to the premises where it's installed, assuming its configured that way. The more redundancy is built into the grid the more reliable it becomes for every user.

  6. #1316
    DiscoMick Guest
    Yes, decentralising storage is a great idea. It's the opposing trend to centralisation, which leads to monopolies and inflated prices.

  7. #1317
    Join Date
    Sep 2012
    Location
    Adelaide Hills
    Posts
    13,383
    Total Downloaded
    0
    cost of batteries (tesla) is too high for me.
    a substation of them might work but, would lead to the same monopoly issue we have now.
    Current Cars:
    2013 E3 Maloo, 350kw
    2008 RRS, TDV8
    1995 VS Clubsport

    Previous Cars:
    2008 ML63, V8
    2002 VY SS Ute, 300kw
    2002 Disco 2, LS1 conversion

  8. #1318
    Join Date
    Apr 2009
    Location
    Crafers West South Australia
    Posts
    11,732
    Total Downloaded
    0
    Another battery installation to provide backup power at a key Adelaide intersection:

    Installing an uninterrupted power supply to provide temporary backup power to the intersection in the event of a power outage.
    Safety upgrade for the Greenhill Road and Portrush Road intersection, Linden Park - DPTI - Department of Planning, Transport and Infrastructure South Australia

  9. #1319
    Join Date
    Sep 2012
    Location
    Adelaide Hills
    Posts
    13,383
    Total Downloaded
    0
    Quote Originally Posted by bee utey View Post

    these are reasonably common at major intersection bee. tollgate/bottom of the freeway has one.
    Current Cars:
    2013 E3 Maloo, 350kw
    2008 RRS, TDV8
    1995 VS Clubsport

    Previous Cars:
    2008 ML63, V8
    2002 VY SS Ute, 300kw
    2002 Disco 2, LS1 conversion

  10. #1320
    Join Date
    May 2013
    Location
    Melbourne
    Posts
    4,842
    Total Downloaded
    0
    I've largely stayed out of this thread because I know very little about power generation,....quite happy to admit that.
    However, I could never see the sense, or the reasoning, in the closing of Hazelwood without a reliable similar cost alternative when so much capacity, particularly in Victoria would be lost.
    Anyway, facts are facts, I know how much my Electricity bills have increased, & I'm not alone.
    A local business, where we regularly spend a few dollars, has been in the Media. The owner of Doyles Deck has stated that his monthly account, since Hazelwood's closure, , has increased from $8k to $24k per month.
    Page 4 Age, Thursday June 7.
    Pickles.

Page 132 of 152 FirstFirst ... 3282122130131132133134142 ... LastLast

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Search AULRO.com ONLY!
Search All the Web!